Design Objective: Design a probe with the capability of operating it on Titan.
Role
• Deputy manager role for the project of designing a probe with design constraints that can make it operable in the atmosphere of Titan.
• Maintaining the Project Design Report (PDR) for the project.
• Handle team meetings and check in on all the aspects and important milestones of the project.
• Maintaining the Project Design Report (PDR) for the project.
• Handle team meetings and check in on all the aspects and important milestones of the project.
Project Requirements
• The main requirement was to examine the lakes of Titan, so the probe was designed to submerge the lake to examine them.
• Developing sensors and probes that could sense the chemical composition of the lake and also the depth of the lake.
• Developing the whole time phase from the launch to the mission completion stage.
• Developing sensors and probes that could sense the chemical composition of the lake and also the depth of the lake.
• Developing the whole time phase from the launch to the mission completion stage.
Results
• Made the PDR of the project.
• Only team to design a submarine with the given mission specifications.
• Only team to design a submarine with the given mission specifications.